Monday, May 21, 2012

May 21, 2012


Day 12: Today we put some furnishing on the deck such as a fishing pole holder built out of scrap wood and old PVC piping, a flagpole built out of more scrap PVC piping, and a mat made of recycled turf carpet from my basement. We loaded the entire boat onto the trailer which will transport it to the Indian Trail Club on a safe, dry day. Pictures from the day:

(flagpole made out of PVC, turf mat to avoid slippage on wet tiles)

(fishing rod holder)

(forklift moving the entire boat)

No comments:

Post a Comment